Branched end layout分支端头布局
Conductors separate toward different ends, creating individual connection points. Branch lengths and directions can follow the equipment modules.导线向不同端头分出,形成独立接入位置。各支路可围绕设备模块分别安排长度与方向。
Ring-terminal and terminal-block harness combines branched end layout, ring-terminal end, terminal-block connection form. Interface, circuit and installation data guide dimensions, material selection and sample review.环形端子与端子排组合分支线束的结构重点包括分支端头布局、环形端子端头、端子排接入形式。接口、电路与安装资料将作为尺寸、物料和样品制作的确认依据。
Use the ring-terminal and terminal-block harness form as a starting point and confirm these design points against drawings and the actual equipment.以环形端子与端子排组合分支线束的结构形式为起点,结合图纸和实际设备确认以下设计要点。


Conductors separate toward different ends, creating individual connection points. Branch lengths and directions can follow the equipment modules.导线向不同端头分出,形成独立接入位置。各支路可围绕设备模块分别安排长度与方向。
A ring-terminal end provides a mounting-hole connection. Lead direction, support and insulation coverage can follow the stud position.末端采用带安装孔的环形端子形式,可围绕螺柱位置安排接线方向、端头支撑与绝缘覆盖。
Leads gather at terminal-block or wiring-board connection points, allowing circuits to be organized by terminal number.多根引线汇集到端子排或接线板连接位置,便于按端子编号组织不同回路。
The assembly organizes a transition or combined connection, with end directions, transition sections and fixing arranged around the equipment positions.组件以转接或组合形式组织连接,可围绕两端设备位置安排端头方向、过渡段与固定。
The table describes the construction and available configuration choices. Materials, dimensions, circuits and inspection requirements are agreed for each project.以下说明展示结构与可配置内容。具体材料、尺寸、电路和检验要求按项目确认。
| Complete BOM and material-supply responsibility整套物料BOM与供料责任 | Separate procured parts, customer-supplied items and accessories in the BOM.BOM列明采购件、客户供料与装配附件。 |
|---|---|
| Included controls, electromechanical parts and installation scope配套控制件、机电件与安装范围 | Define included devices and installation scope by module boundaries.配套元件及安装范围按模块边界说明。 |
| Assembly hierarchy, installation sequence and tools装配层级、安装顺序与工具需求 | Define assembly levels, sequence and tools for the complete structure.安装层级、顺序和工具由整套结构确定。 |
| Module acceptance and system-function boundaries模块验收与整套功能边界 | Agree responsibilities for module checks and system-function validation separately.模块检查与整机功能验证的责任分别约定。 |
| Circuit and revision reference电路与版本依据 | Define the exact supply boundary, customer-supplied parts, approved manufacturers, substitution approval process, inspection records, packing unit and revision authority.需要明确供货边界、客供物料、认可制造商、替代审批流程、检验记录、包装单位和版本批准权限。 |
| Sample and manufacturing configuration样品与制造配置 | The project normally passes through DFM review, BOM and source confirmation, first-article build, customer approval and controlled production release. Future changes are handled through a recorded revision process.项目通常经过可制造性审核、BOM与来源确认、首件制作、客户批准和受控量产放行;后续变更通过可追踪的版本流程处理。 |
These are connection directions for project discussion. Suitability depends on interfaces, circuits, installation conditions and project validation; configuration can be adapted to the equipment.以下为可讨论的连接方向。实际适用性取决于接口、电路、安装环境和项目验证,可按设备需求调整。

Complete machine looms and installation kits covering panels, sensors, motors, actuators and distributed modules. Separate procured parts, customer-supplied items and accessories in the BOM.覆盖面板、传感器、电机、执行器与分布式模块的完整设备线束与安装套件。选配时,BOM列明采购件、客户供料与装配附件。

Station-specific harness sets for robots, tooling, conveyors, safety devices and control cabinets, labeled to the cell build sequence. Define included devices and installation scope by module boundaries.为机器人、末端工具、输送、安全器件与控制柜提供按单元装配顺序标识的工位线束套件。选配时,配套元件及安装范围按模块边界说明。

Pre-terminated panel wiring, grounding leads, jumpers and fuse or relay subassemblies supplied to drawings and terminal schedules. Define assembly levels, sequence and tools for the complete structure.依据图纸与端子表交付预制面板线、接地线、跳线以及保险或继电器子组件。选配时,安装层级、顺序和工具由整套结构确定。

Internal harness kits joining control boards, motors, heaters, switches and user interfaces with appliance-specific routing and labels. Agree responsibilities for module checks and system-function validation separately.按照设备特定路径与标签连接控制板、电机、加热器、开关和人机界面的内部线束套件。选配时,模块检查与整机功能验证的责任分别约定。

Source-controlled harnesses and field connection kits for pumps, treatment modules, monitoring devices and auxiliary systems. Separate procured parts, customer-supplied items and accessories in the BOM.为泵、处理模块、监测器件与辅助系统提供来源受控线束和现场连接套件。选配时,BOM列明采购件、客户供料与装配附件。

Low-volume cable and harness sets with fixtures, identifiers and documented inspections for benches, instruments and specialized equipment. Define included devices and installation scope by module boundaries.为测试台、仪器和专用设备提供含工装、标识与记录检验的小批量线缆线束套件。选配时,配套元件及安装范围按模块边界说明。


Our China factory supports turnkey harness projects through custom wire harness manufacturing and OEM/ODM development. Interface, circuit and installation data guide material selection, sample builds and manufacturing-document approval before repeat production.Super Smile-Tech 中国工厂围绕交钥匙线束的项目需求提供定制线束制造与 OEM/ODM 支持。我们从接口、电路与安装资料开始,协同物料选配、样品制作和制造文件确认,再按批准要求组织重复生产。
Drawings, pin tables, samples, equipment photos and component data are reviewed for gaps. Assumptions and open points are recorded before the drawing, BOM and inspection plan are released.审核图纸、针脚表、样品、设备照片与器件资料中的缺口,在放行图纸、BOM与检验计划前记录假设和待确认项。
An existing assembly is measured and electrically mapped, while hidden ratings, unavailable parts and undocumented processes are identified for customer review before a repeatable specification is frozen.对现有组件进行测量和电气映射,同时识别隐藏额定、停产物料与未记录工艺,在冻结可重复规格前交由客户审核。
Long-lead or unavailable items are flagged early. Alternatives are compared by mating, rating, material, tooling, approval documents, installation impact and customer authorization before release.提前识别长交期或停供物料。替代件从对插、额定、材料、工装、认可文件、安装影响与客户授权等方面比较后放行。
The exact scope is project-specific. It can include engineering review, sourcing, customer-supplied parts, harness assembly, accessories, labels, inspection, records, kitting and packaging. The quotation and approved documents define the boundary.准确范围按项目确定,可以包含工程审核、采购、客供件、线束组装、附件、标签、检验、记录、配套与包装。报价与批准文件定义边界。
Yes, when receiving condition, quantities, ownership, shortage handling, unused return, traceability and responsibility for part suitability are agreed before production.可以,但生产前需约定收料状态、数量、所有权、短缺处理、余料退回、追踪与物料适用责任。
Alternatives are compared technically and commercially, then released only through the agreed customer approval route. A temporary deviation is recorded separately from the standard BOM.替代件经过技术与商务比较,只能通过约定客户审批路径放行;临时偏差与标准BOM分开记录。
Share mating interfaces, a circuit table, target lengths or a sample for the ring-terminal and terminal-block harness. We can use them to review configuration and sample requirements.提供环形端子与端子排组合分支线束的对插接口、回路表、目标长度或参考样品,我们据此梳理选配与样品确认事项。