Branched end layout分支端头布局
Conductors separate toward different ends, creating individual connection points. Branch lengths and directions can follow the equipment modules.导线向不同端头分出,形成独立接入位置。各支路可围绕设备模块分别安排长度与方向。
Agricultural Equipment Large Plug Long-Lead Branch Harness combines branched end layout, rectangular interface form, plug-in connection end. Interface, circuit and installation data guide dimensions, material selection and sample review.农机大插头长线分支线束的结构重点包括分支端头布局、矩形接口外形、插接式端头。接口、电路与安装资料将作为尺寸、物料和样品制作的确认依据。
Use the agricultural equipment large plug long-lead branch harness form as a starting point and confirm these design points against drawings and the actual equipment.以农机大插头长线分支线束的结构形式为起点,结合图纸和实际设备确认以下设计要点。


Conductors separate toward different ends, creating individual connection points. Branch lengths and directions can follow the equipment modules.导线向不同端头分出,形成独立接入位置。各支路可围绕设备模块分别安排长度与方向。
The rectangular interface form allows end position and service clearance to follow the mating face, latch and cable exit.接口采用矩形轮廓,可围绕插入面、卡扣与线束出口安排端头位置和拆装空间。
The end uses a plug-in form, with clearance arranged for insertion, removal and cable bends.端头采用插接形式,可围绕安装位置安排插入、退出及线缆弯曲空间。
The table describes the construction and available configuration choices. Materials, dimensions, circuits and inspection requirements are agreed for each project.以下说明展示结构与可配置内容。具体材料、尺寸、电路和检验要求按项目确认。
| Agricultural machine make/model/year and implement农机品牌、型号、年款与实施部件 | Identify machine and implement model/year separately.农机和实施部件的型号、年款分别识别。 |
|---|---|
| Controller, sensor and ISOBUS interface definitions控制器、传感器、ISOBUS接口定义 | Define controller, sensor and ISOBUS paths from the actual interfaces.控制器、传感器及ISOBUS按实际接口定义。 |
| Dust, agrochemicals, mud/water and vibration尘土、农药、泥水和振动条件 | Select protection for agrochemicals, dust, mud/water and vibration.农药、尘土、泥水与振动决定防护组合。 |
| Articulation/implement lift motion and branch fixing铰接或机具提升行程与分支固定 | Use articulation and lift travel to set slack and fixing positions.铰接及提升行程决定松弛量和固定位置。 |
| Circuit and revision reference电路与版本依据 | For quotation, provide machine make, model and revision, voltage, circuit and pin schedules, mating connector part numbers, loads and fusing, CAN/ISOBUS topology if used, branch lengths and installation photographs, movement and exposure zones, quantity, labels and the agreed inspection scope.报价请提供设备品牌、型号与版本、电压、回路和针脚表、对插连接器料号、负载与保险配置、涉及的 CAN/ISOBUS 拓扑、分支尺寸和安装照片、运动与暴露区域、数量、标签及约定检验范围。 |
| Sample and manufacturing configuration样品与制造配置 | The approved drawing and first article freeze connector orientation, cavity map, branch datum, covering transitions, clips, service loops and test points. Routine continuity, shorts, dimensional and visual checks are recorded to the agreed plan.经批准的图纸与首件应冻结连接器方向、孔位映射、分支基准、包覆过渡、卡扣、检修余量及测试点。常规导通、短路、尺寸和外观检查按约定方案记录;密封、振动、弯曲、热和整机功能验证属于另行定义的项目测试,不能由线序合格推定。 |
These are connection directions for project discussion. Suitability depends on interfaces, circuits, installation conditions and project validation; configuration can be adapted to the equipment.以下为可讨论的连接方向。实际适用性取决于接口、电路、安装环境和项目验证,可按设备需求调整。

Use distinct branch environments for cab, powertrain and chassis. Identify machine and implement model/year separately.驾驶室、动力和底盘采用各自分支环境。选配时,农机和实施部件的型号、年款分别识别。

Set branch slack for towing, lifting and articulation. Define controller, sensor and ISOBUS paths from the actual interfaces.牵引、提升和铰接行程影响支路余量。选配时,控制器、传感器及ISOBUS按实际接口定义。

Support field identification and removal through labels, fixing and access. Select protection for agrochemicals, dust, mud/water and vibration.标识、固定及接口位置需支持田间辨识与拆装。选配时,农药、尘土、泥水与振动决定防护组合。

For exposed implement wiring, review connectors, outlets, fixing points and moisture exposure at the actual equipment position, then choose protection materials for the project. Use articulation and lift travel to set slack and fixing positions.外露接线需结合机具位置确认接头、出口、固定点和水汽暴露条件,按项目要求选择防护材料。选配时,铰接及提升行程决定松弛量和固定位置。

Coordinate support/protection for dust, vibration and moving mechanisms. Identify machine and implement model/year separately.粉尘、振动及移动机构共同决定支撑与防护。选配时,农机和实施部件的型号、年款分别识别。

Define cab-to-implement connections from project interfaces, network and supply requirements. Where ISOBUS is specified, check the corresponding system requirements separately. Define controller, sensor and ISOBUS paths from the actual interfaces.驾驶室与机具之间的连接依据项目接口、网络及供电定义确认;采用ISOBUS时另核对相应系统要求。选配时,控制器、传感器及ISOBUS按实际接口定义。


Our China factory supports agricultural & tractor harness projects through custom wire harness manufacturing and OEM/ODM development. Interface, circuit and installation data guide material selection, sample builds and manufacturing-document approval before repeat production.Super Smile-Tech 中国工厂围绕农机与拖拉机线束的项目需求提供定制线束制造与 OEM/ODM 支持。我们从接口、电路与安装资料开始,协同物料选配、样品制作和制造文件确认,再按批准要求组织重复生产。
Identify machine and implement model/year separately.农机和实施部件的型号、年款分别识别。
Define controller, sensor and ISOBUS paths from the actual interfaces.控制器、传感器及ISOBUS按实际接口定义。
Use articulation and lift travel to set slack and fixing positions.铰接及提升行程决定松弛量和固定位置。
No. It is a category covering cab, engine, chassis, lighting, sensor and implement assemblies. Machine model, options, pin map, voltage and installation define the actual part.不是。这是涵盖驾驶室、发动机、底盘、照明、传感器和农具组件的小类,具体零件取决于机型、选装、针脚表、电压与安装条件。
No. Mating hardware is only the physical layer. ISO 11783 network design, controller software, power allocation and the required AEF functions must be checked for the tractor and implement combination.不能。对插硬件只是物理层;还要针对拖拉机和农具组合核对 ISO 11783 网络设计、控制器软件、供电分配和所需 AEF 功能。
It can establish some dimensions and interfaces, but damage, field repairs, hidden wire specifications and machine-option differences need separate confirmation before the first article is approved.旧样可帮助确认部分尺寸和接口,但损伤、现场维修、隐藏线材规格与机型选装差异须分别确认后才能批准首件。
Share mating interfaces, a circuit table, target lengths or a sample for the agricultural equipment large plug long-lead branch harness. We can use them to review configuration and sample requirements.提供农机大插头长线分支线束的对插接口、回路表、目标长度或参考样品,我们据此梳理选配与样品确认事项。